Basement - The whole process

We started the basement renovation in March, 2009. When we bought the house, the intention was to renovate the basement to be a studio space for me (Lindsay) and office, as I work from home.


basement 3
This is what our basement started off looking like.

Blog_Basement_2
And this.
Blog_Basement_1

In the meantime, I set up my office in our 2nd Bedroom. It was cramped.

Blog_Basement_3

We broke up the concrete ourselves, saving us TONS of money.

Blog_Basement_4

It was an obstancle course!

Blog_Basement_5

Since the floor was up, we had the old clay pipes replaced with new. We also had the correct plumping for a new 3 pc. bathroom installed, and we moved around the plumbing for where the Washing Machine used to be, to be in a new location at the front of the house. (Vs. at the back)

Blog_Basement_6

A new concrete floor was professionally poured.

Blog_Basement_7

Aubrey + his brother built a new set of stairs for between the main floor + basement. We looked into getting pre made stairs, but it was SUPER expensive. This process wasn't easy, calculating risers & runners, but Perry, Aubrey's brother who had experience with stair building for theater sets, was VERY helpful with calculating.

Blog_Basement_11

Aubrey built new walls, and added a vapour barrier.

Blog_Basement_9

Dad came over and helped install the insulation!

Blog_Basement_8

Blog_Basement_19

Drywall was professionall installed + taped - we're so glad we hired out for this.

Blog_Basement_17

Laminate flooring was our choice for the basement flooring. The flooring we picked was Traffic Master flooring from Home Depot, and the colour is a Walnut. Aubrey installed it himself.
to see more posts on the flooring, click here.

Blog_Basement_16

Our washer + dryer have been moved to the front of the house by where the Gas meter was. We couldn't afford to have the gas meter moved outside, so we came up with this plan to hide the meter...

Blog_Basement_15

Ta-Da! Click here to see the post on hiding the gas meter.

Office_1

The project took us a little under 6 months, with Aubrey doing it on his days off, and getting trades in. The basement is still being decorated and finalized, so there isn't a true "after shot" just yet, but the above gives you some idea into how it's coming along!

The bathroom still needs completing, we're awaiting our pocket door still for that room, and we may start tiling sooner vs. later.

0 comments:

Post a Comment